[Closed] Valley of Stone cycleway

7 Posts
5 Users
0 Reactions
118 Views
Posts: 8612
Full Member
Topic starter
 

Does anyone know if this is complete? Runs from Healey Dell to Rawtenstall and was meant to open ‘in 2019’. I know they’ve done the bottom end…


 
Posted : 03/01/2020 3:51 pm
Posts: 6762
Full Member
 

The section through the tunnels in Waterfoot is now all open, rode through today. Not sure where the route goes through Bacup from the top of New Line.

Map here

but it's not easy to follow.


 
Posted : 03/01/2020 4:42 pm
Posts: 8612
Full Member
Topic starter
 

Aye, I’ve seen the map. Might have to go on a recce at some point.


 
Posted : 03/01/2020 4:58 pm
Posts: 6762
Full Member
 

Just don't get lost in the depths of Bacup!


 
Posted : 03/01/2020 5:45 pm
Posts: 8612
Full Member
Topic starter
 

Good lord no.


 
Posted : 03/01/2020 6:32 pm
Posts: 2006
Free Member
 

Be careful on the bit through Stacksteads, few local reports in the last few months of bikes taken off people. Lee Quarry is also one of the areas targeted for bike muggings.

As I understand it the cycleway gets you into Stubylee Park, then on to the bridleway that runs at the bottom of Lee Quarry, you then drop into Stacksteads and decide if you are going to go through the tunnels. You can get behind the shops in Waterfoot and after a quick dash on the main road go through the colour factory to get back on to the cycle route into Rawtenstall just before Tesco

Just looked at the map, I doubt section 8 and 9 exist atm


 
Posted : 04/01/2020 11:16 am
Posts: 7932
Free Member
 

I recall that on the bits through Waterfoot that you'll need your dog shit radar on maximum alert.


 
Posted : 04/01/2020 11:59 am
Posts: 2053
Full Member
 

Went along it last week as far as stublee, section 8&9 are in place I think.

Section 3/4 is on road from colour factory to water foot mini roundabout. Tunnels are good and well lit.

Section 1 is worst as it's just on the bacup road past Ride On and the health centre.

.


 
Posted : 04/01/2020 4:03 pm