Self build
 

  You don't need to be an 'investor' to invest in Singletrack: 6 days left: 95% of target - Find out more

[Closed] Self build

39 Posts
15 Users
0 Reactions
96 Views
Posts: 0
Free Member
Topic starter
 

Following on from the "house built from scratch" thread, I'll pop a photo or two on here now and then.
https://m.flickr.com/#/photos/131379802@N06/16733005209/

Bear with me as I've never done the photo stuff before.


 
Posted : 24/03/2015 7:18 pm
Posts: 5720
Full Member
 

Nice dog 🙂


 
Posted : 24/03/2015 7:36 pm
Posts: 0
Free Member
Topic starter
 

Yeah it's my pal's who drives the digger. Sits at his feet while he drives it.
That's when it's not searching for balls!
Any techy's point me in the right direction to make the photos show on here?


 
Posted : 24/03/2015 8:06 pm
Posts: 19434
Free Member
 

What sort of house are you building?

Some plans of the house or pics?

What sort of budget?

🙂


 
Posted : 24/03/2015 8:08 pm
Posts: 0
Free Member
Topic starter
 

Four bed with integral garage. Going to be quite modern. Rendered finish and grey aluminium window etc.
I don't have a set budget but hoping to be around £130k plus land purchase (£85k)


 
Posted : 24/03/2015 8:37 pm
Posts: 19434
Free Member
 

russ295 - Member
Four bed with integral garage. Going to be quite modern. Rendered finish and grey aluminium window etc.

That sounds good.

I don't have a set budget but hoping to be around £130k plus land purchase (£85k)

That's a good price considering all the overpriced shite they are building nowadays.


 
Posted : 24/03/2015 8:39 pm
Posts: 0
Free Member
Topic starter
 

Hopefully it should be around that figure. I'll be doing the majority of the work myself to keep costs down and have lots if other contacts to do the rest.


 
Posted : 24/03/2015 9:26 pm
Posts: 12329
Full Member
 

Right click over your image.

Click "copy image URL"

Go to your post on here, and click the "IMG" box.

Delete the "http" thing that automatically populates in there, so the box is blank.

Right click and select 'paste'.

Job done. Email me if you're having problems.

[img] [/img]


 
Posted : 24/03/2015 9:34 pm
Posts: 0
Free Member
 

Best of luck with the build, keep them photos coming.


 
Posted : 24/03/2015 9:43 pm
Posts: 19434
Free Member
 

Oh ya ... rather nice plot of land you got there.


 
Posted : 24/03/2015 9:47 pm
Posts: 4954
Free Member
 

Will any of the spaces have reverence?


 
Posted : 24/03/2015 9:48 pm
Posts: 1310
Free Member
 

Nice, was going to mention in other thread but if you need any plumbing/heating stuff I may be able to help. Long way off yet though!


 
Posted : 24/03/2015 9:59 pm
Posts: 0
Free Member
Topic starter
 

Can the photos be linked using iphone/ipad?
Not sure what you mean about the spaces?

I plan to fit wet underfloor heating fed via a system boiler with a hot water store so I'll be need quite a bit of plumbing gear!
I'll post a copy of the plan when I get a chance.


 
Posted : 24/03/2015 10:35 pm
Posts: 0
Free Member
Topic starter
 

[img] [/img]

Sussed!


 
Posted : 25/03/2015 6:54 am
Posts: 0
Free Member
Topic starter
 

Day 2.
Most of the top soil has been removed and a couple of the awkward footings have been dug.
Shifted 10 wagons (about 100ton) and there's 3 coming first thing today. It's unreal how much stuff comes out.

[img] [/img]

[img] [/img]

Had a little help tho.
This week should see the land cleared, footings dug, service trench dug and the drive levelled and a few wagons of stone laid to create a drop zone for deliveries and to keep the mud to a minimum.
Going to gravel the drive later on using a geo grid base.


 
Posted : 25/03/2015 7:11 am
Posts: 0
Free Member
Topic starter
 

[img] [/img]

Sat image of the plot. The rear part from the centre line of the trees belongs to the council but they don't have any access. There's no fence so my garden will get a little bigger!


 
Posted : 25/03/2015 7:35 am
 ART
Posts: 1073
Full Member
 

Yup the dog is the star here, let's be clear about that ... 😉


 
Posted : 25/03/2015 9:22 am
Posts: 0
Free Member
Topic starter
 

[img] [/img]
[img] [/img]

Day 3. Most of the long footings dug. The dog was just making sure it's straight.
6 more wagons of muck taken!


 
Posted : 25/03/2015 7:16 pm
Posts: 4954
Free Member
 

Not sure what you mean about the spaces?

Kevin Mccloud always bangs on about "the space has ...." in a pretentious way, I was mocking him with out him even knowing it, but not mocking you. Cool project, hope to do the same one day.


 
Posted : 25/03/2015 7:43 pm
Posts: 1310
Free Member
 

Get those trees down now and by the time you're finished you'll have plenty of fuel left for the inevitable wood burner that you'll be putting in


 
Posted : 25/03/2015 7:48 pm
Posts: 0
Free Member
Topic starter
 

I can't! There is a blanket TPO on the whole area.
Once the house is up there be a few coming out every now and then. Mostly on windy days!
And yes there's a log burner going in.


 
Posted : 25/03/2015 8:55 pm
Posts: 13594
Free Member
 

We taught our cat to drive the mini-digger:

[url= https://farm9.staticflickr.com/8316/7979920559_fc8de94d56.jp g" target="_blank">https://farm9.staticflickr.com/8316/7979920559_fc8de94d56.jp g"/> [/img][/url][url= https://flic.kr/p/daabne ]George the digger cat[/url] by [url= https://www.flickr.com/people/75003318@N00/ ]brf[/url], on Flickr


 
Posted : 25/03/2015 9:15 pm
Posts: 0
Free Member
 

How big is the plot Russ?


 
Posted : 25/03/2015 9:26 pm
Posts: 0
Free Member
 

Footings seem a little shallow? Are you backfilling each day btw? Got some crappy weather due tonight. Nice dog.


 
Posted : 25/03/2015 9:33 pm
Posts: 0
Free Member
Topic starter
 

Not sure tbh?
If you look at the sat view. The house directly next door is a 4 bed detached. So you can judge of that but it's a good size.


 
Posted : 25/03/2015 9:35 pm
Posts: 0
Free Member
Topic starter
 

That footing is 1050 from dpc. 300 x 600 strip foundations.


 
Posted : 25/03/2015 9:44 pm
Posts: 0
Free Member
 

That's a good size. Looking forward to following your progress. Best of luck.


 
Posted : 25/03/2015 9:50 pm
Posts: 0
Free Member
 

So 750 to damp from top of found? Block/beam? Why have you reduce dug the muck so much if you're having to cart away?


 
Posted : 25/03/2015 9:52 pm
Posts: 0
Free Member
Topic starter
 

750 less 70 screed, 100 insulation, 150 beam and a 150 min void. But has to be stripped of soil and veg.
Clay was a little lower than I'd of hoped for:-(


 
Posted : 25/03/2015 10:07 pm
Posts: 1083
Full Member
 

What's the building on the other side?


 
Posted : 25/03/2015 10:08 pm
Posts: 0
Free Member
 

Nothing worse than muck away on jobs, did none of your neighbours want any raised beds? 😆
Keep digging...


 
Posted : 25/03/2015 10:12 pm
Posts: 0
Free Member
 

how many square meter is your new build going to be??


 
Posted : 25/03/2015 10:19 pm
Posts: 0
Free Member
Topic starter
 

Other side is a residential care home.

I had the local allotment guys back and forward taking barrows, they were like the seven dwarfs!

Not sure of the total metre-age but downstairs floor area without the garage is 87sq mtrs.


 
Posted : 25/03/2015 11:57 pm
Posts: 0
Free Member
Topic starter
 

[img] [/img]

[img] [/img]

Plan and elevations.
There a few changes to the plan. Garage at the front (the wife's not happy as it was the lounge, but needs must)
There's no dormers or velux windows and the rear extension is flat roofed with a orangey type roof.


 
Posted : 26/03/2015 7:12 am
Posts: 0
Free Member
 

any updates?


 
Posted : 13/04/2015 2:21 pm
Posts: 1299
Free Member
 

There a few changes to the plan. Garage at the front (the wife's not happy as it was the lounge, but needs must)

What.. you've already got a sitting room! I'd make it a kitchen/diner and extend the garage all the way back, gives you room for a car in the front and a proper bike workshop at the back.

Plus, if she really doesn't like it it's the ideal time for a new patio... 😆


 
Posted : 13/04/2015 3:15 pm
Posts: 0
Free Member
Topic starter
 

[img] [/img]

Not much tbh. Poured the concrete for the footings sat morning. 21 cubed metres.
Pump come in handy, done in 3 hours.
Couple of weeks before the bricky starts.


 
Posted : 13/04/2015 4:47 pm
Posts: 0
Free Member
Topic starter
 

[img] [/img]

Got a price for the sewer connection £6800 plus vat. Not happy.
Photo of my dog to make me happy.


 
Posted : 13/04/2015 4:50 pm
Posts: 0
Free Member
 

Would that be a 24/4? Great bits of kit. What did you do for the other 90 mins while you were pouring 😉
Sewer connection is a bastard, nothing on site or nearby you can connect onto then?


 
Posted : 13/04/2015 5:41 pm
Posts: 0
Free Member
Topic starter
 

30 meter pump. Biggest one they did.
There is a possibility of tying into next door but she's not to keen. Her son is a builder so I'm going to ask him if he wants to do it if she will go for it.
Other than that it's bite the bullet and pay!


 
Posted : 13/04/2015 5:48 pm

6 DAYS LEFT
We are currently at 95% of our target!