You don't need to be an 'investor' to invest in Singletrack: 6 days left: 95% of target - Find out more
We have a combi boiler, before new flooring goes down we were thinking of having a radiator moved further along a wall so we can utilise the wall space.
We'd provide a new vertical rad
Floorboards are already exposed so pipe work is easy to get at.
Rough estimate?? London tax I presume !
Had one quote which was £450 not including the rad !
Doesn't sound right at all.
Time ??
Thanks in advance
Sounds high. It's easy enough to do yourself (especially as the floor boards are up).
But if you have to pay someone, it'd be a single day job at the absolute tops plus a few quid for joints, pipe etc.