You don't need to be an 'investor' to invest in Singletrack: 6 days left: 95% of target - Find out more
So today after many months of rebuilding a brick arch (twice), lots of pointing, casting a concrete slab and cutting reclaimed slate tiles, we finally have the first of two new wood burners installed.
Its nearlly as exciting as getting a new bike 😆
From this:
[url= https://farm4.staticflickr.com/3937/33619110015_76ea9b60b3_z.jp g" target="_blank">https://farm4.staticflickr.com/3937/33619110015_76ea9b60b3_z.jp g"/> [/img][/url][url= https://flic.kr/p/TdNJ8R ]Fireplace[/url] by [url= https://www.flickr.com/photos/windydave13/ ]Dave Aspinall[/url], on Flickr
To this:
[url= https://farm5.staticflickr.com/4422/37034255646_c41b3f6604_z.jp g" target="_blank">https://farm5.staticflickr.com/4422/37034255646_c41b3f6604_z.jp g"/> [/img][/url][url= https://flic.kr/p/YqAeX5 ]Heta 45[/url] by [url= https://www.flickr.com/photos/windydave13/ ]Dave Aspinall[/url], on Flickr
Now all i need to do is fix the oak beam for the mantelpiece and plaster then we're set for winter. Lets hope we don't have an indian summer or i won't be able to light it 😯
10 Nov is D day for us. Can't wait...
After the initial burn to get it up to temperature I now have to wait till it's cooled down enough to touch by hand then re-light it. The suspense is killing me. It's like Christmas Eve for a 5yesr old 😆