 TimP
Posts: 1782
Free Member
Topic starter
 

Come on, someone on here must be an expert in CFA piles, surely?

My question is regarding the cage and how long it should be. I would only make it long enough to engage sufficient skin friction to resist any uplift, but the older generation want to put it all the way down. difference is 10m of cage (from 7m to resist uplift to 17m to go to the bottom) over 300 piles which is a lot of reinforcement.


 
Posted : 19/02/2016 2:37 pm
 kevj
Posts: 0
Free Member
 

Been years since I've carried out any pile design, but: you mention uplift case, what magnitude are the bearing loads?

The piles can fail due to compressive fracture at the base and the rebar provides the tensile strength circumferential to the pile in the lower portion.


 
Posted : 19/02/2016 2:47 pm
Posts: 0
Free Member
 

not my field but for 3000 m of reinforcement i'd pay for a second opinion


 
Posted : 19/02/2016 2:50 pm
 TimP
Posts: 1782
Free Member
Topic starter
 

I am the second opinion! but I don't have anything to back up my comments on the original design which I say is OK, just the person I am checking it for wants the long cages


 
Posted : 19/02/2016 3:08 pm
 TimP
Posts: 1782
Free Member
Topic starter
 

Kevj these are 450mm dia taking 400kN so not very heavily loaded


 
Posted : 19/02/2016 3:09 pm
Posts: 251
Full Member
 

[i]I am the second opinion[/i]

"In my opinion (and a large number of underqualified, underinformed or both mtbers I consulted agree with me on this)..."


 
Posted : 19/02/2016 3:12 pm
Posts: 495
Full Member
 

Hi, I was a designer at a piling contractor for a number of years, now in consultancy, drop me an email if you like - details in profile.


 
Posted : 19/02/2016 3:20 pm
 TimP
Posts: 1782
Free Member
Topic starter
 

Wwaswas, get back to your shipping forecast!!


 
Posted : 19/02/2016 3:24 pm
Posts: 218
Free Member
 

How confident are you in the soils information you are working with / ground model and that in all cases sufficient skin friction will be mobilised from the upper section of the pile ?


 
Posted : 19/02/2016 3:32 pm
 DrP
Posts: 12041
Full Member
 

I frequently deal with piles.
What's the question again?

DrP


 
Posted : 19/02/2016 3:35 pm
Posts: 495
Full Member
 

Tim got your email, will respond in a bit (waiting for the bus home!). Will try and keep any comments regarding structural engineers trying to understand geotechnics private 😉


 
Posted : 19/02/2016 3:38 pm
Posts: 0
Free Member
 

It'll be fine, just fill any voids or cracks with expanding foam.

I fix telephones for a living(badly, if today's efforts are anything to go by)


 
Posted : 19/02/2016 3:40 pm
Posts: 0
Free Member
 

I would avoid designing full length cages for CFA piles as you would probably struggle to install 17m long cages. We would typically keep the cages less than 12m and install a central bar (if required) to deal with any tension.


 
Posted : 19/02/2016 3:55 pm
 TimP
Posts: 1782
Free Member
Topic starter
 

DrP

It comes down to whether I can pull really hard on a pile or is that a bad idea?


 
Posted : 19/02/2016 3:55 pm
Posts: 17187
Full Member
 

^^^ if you're pulling more than pushing then it's a ground anchor 🙂


 
Posted : 19/02/2016 3:57 pm
Posts: 251
Full Member
 

[i]install a central bar (if required) to deal with any tension. [/i]

"Did you spill my pint?"

"Sorry mate, here's a tenner go and buy another at the central bar over there."

"Cheers, thanks"


 
Posted : 19/02/2016 3:57 pm
Posts: 495
Full Member
 

Just emailed you my thoughts, basically 8.3m assuming a cu of 70 in the clay. Forgot to add, but really you should also check bond capacity of the rebar to the concrete as well. Also, depending on the addition length this adds to your bending requirements, you could consider just using a central bar for tension.


 
Posted : 19/02/2016 3:59 pm
 DrP
Posts: 12041
Full Member
 

^^^^
Yeah, this. 8.3ish should do the trick. Double check bond capacity though - I know you slack on that.

DrP


 
Posted : 19/02/2016 4:01 pm
 TimP
Posts: 1782
Free Member
Topic starter
 

Thanks all!!


 
Posted : 19/02/2016 4:08 pm
 DrP
Posts: 12041
Full Member
 

Welcome.

DrP


 
Posted : 19/02/2016 4:11 pm

6 DAYS LEFT