New Tyre Time? Tube...
 

  You don't need to be an 'investor' to invest in Singletrack: 6 days left: 95% of target - Find out more

[Closed] New Tyre Time? Tubeless sidewall cut

7 Posts
6 Users
0 Reactions
35 Views
Posts: 0
Free Member
Topic starter
 

Today I slashed a 1cm hole in the side of my Maxxis aggressor rear tyre, is this repairable or is it new tyre time?

If so, what’s a decent rear tyre for winter/spring riding? This is my first non-26 bike so there’s a lot more options that open up. Maxxis or none Maxxis is fine, function over form.

Thanks


 
Posted : 17/10/2020 7:56 pm
Posts: 3073
Full Member
 

I did the same with a gravel tyre last week. I patched the cut with a normal inner tube patch then glued a thicker 2cm x 2cm tyre patch over the top of that. It stayed up for a week and survived a long off road ride today, so if the tread is still good it’s worth trying to save it


 
Posted : 17/10/2020 8:05 pm
Posts: 9783
Full Member
 

You should be able to to a permanent repair with a motorbike mushroom plug, for what they cost they should be in everyone's repair kit


 
Posted : 17/10/2020 8:10 pm
Posts: 0
Free Member
Topic starter
 

Excellent, I don’t generally run different tyres through the year so I was hoping I could save it. Thanks


 
Posted : 17/10/2020 8:11 pm
Posts: 4213
Free Member
 

Stitch the cut up with dental floss, innertube patch on the inside, possibly one on the outside too depending on how paranoid you are. Go ride...


 
Posted : 17/10/2020 8:16 pm
Posts: 3508
Free Member
 

I have done as Jon suggests before now and worked a treat but dont bother anymore as doing what Tracey suggests is so much easier and will defo last the lifetime of the tyre.

I now have a few mushroom plugs in the toolbox, just in case. Kwik fit were happy enough to hand a few over


 
Posted : 17/10/2020 8:22 pm
Posts: 8527
Free Member
 

Aye, do as Tracey says. Sorted.


 
Posted : 17/10/2020 9:56 pm
Posts: 0
Free Member
Topic starter
 

Mushroom plugs ordered. Cheers everyone for the advice


 
Posted : 17/10/2020 10:29 pm

6 DAYS LEFT
We are currently at 95% of our target!