Anyone know how the scheme to Tarmac the canal towpath between Leeds and Shipley is progressing?

It was due to be completed before the TdF, but can't find anything on the web about actual progress/completion.

Anyone ride it regularly who can update?
Thanks


 
Posted : 09/06/2014 7:59 am
Posts: 12
Full Member
 

I believe that the Contractor's pricing the job were 'taking the p*ss' knowing that the works had to be completed for the TDF. So they've put the works on hold to renegotiate the price.

On Wednesday was still a puddle-fest 🙂


 
Posted : 09/06/2014 8:08 am
Posts: 0
Free Member
Topic starter
 

Thanks Sheeps. I was sceptical about the timescale, so that's no surprise. Shame though.


 
Posted : 09/06/2014 8:14 am
 ton
Posts: 24124
Full Member
 

it is still a wet puddle fest from kirkstall bridge to the west.


 
Posted : 09/06/2014 9:09 am
Posts: 341
Free Member
 

Lets hope they do a better job than the loiverpool end, rough in places, and also the shropie in chester, like a fairground ride, numerous poor surfaces.


 
Posted : 09/06/2014 9:41 am
 stew
Posts: 0
Free Member
 

Well after today's ride to work (first of the year on the towpath) I can confirm that they have tarmacked from Kirkstall to Rodley and seem to be progressing pretty quickly.


 
Posted : 10/02/2015 8:28 pm
 ton
Posts: 24124
Full Member
 

shame they have done nothing east. still a muddy wet potholed crap surface.


 
Posted : 10/02/2015 8:34 pm
Posts: 15907
Free Member
 

I think it's good that it's not tarmac. It would increase people's speed dramatically making it very dangerous.


 
Posted : 10/02/2015 8:37 pm
Posts: 0
Free Member
 

http://www.cyclebradford.org.uk/uncategorized/towpath-closure-notice-leeds-liverpool-canal/

Apparently the section between Skipton and Bradley is going to be sorted out, i.e. a hardcore surface


 
Posted : 10/02/2015 8:47 pm
 ton
Posts: 24124
Full Member
 

I think it's good that it's not tarmac. It would increase people's speed dramatically making it very dangerous.

do you mean to the east?
i dont think it is busy enough to be dangerous.
i ride in from rothwell fanny pit, all the way to kirkstall, the east side is dead in comparison to the west side, which is pretty busy, and full of strava warriors tonking on blind into the bridges/tennels.


 
Posted : 10/02/2015 8:51 pm
Posts: 0
Free Member
 

Sunday lunch at The Railway without getting muddy. Don't mind that.


 
Posted : 10/02/2015 8:54 pm
Posts: 15907
Free Member
 

[img] [/img]

😆


 
Posted : 10/02/2015 9:05 pm
Posts: 8849
Free Member
 

Apparently the section between Skipton and Bradley is going to be sorted out, i.e. a hardcore surface

YEEEEES!!, part of my commute, just need to get sections at Silsden and Riddlesden sorted. I've even considered offering to fix the Riddlesden bog section myself.


 
Posted : 10/02/2015 9:13 pm
Posts: 8
Free Member
 

project - Member
Lets hope they do a better job than the loiverpool end, rough in places, and also the shropie in chester, like a fairground ride, numerous poor surfaces.

The Liverpool end is great all the way to Lydiate (apart from a little bit before Aintree)
It's really bad west of Wigan near the Blue Elephant and I hated the bit between the A59 to Skipton last year.


 
Posted : 10/02/2015 9:32 pm
 ton
Posts: 24124
Full Member
 

gargrave to skipton bit is pants too.


 
Posted : 10/02/2015 9:36 pm