Goodridge braided h...
 

  You don't need to be an 'investor' to invest in Singletrack: 6 days left: 95% of target - Find out more

[Closed] Goodridge braided hose kit for Hope Tech m4 - is this right?

5 Posts
3 Users
0 Reactions
73 Views
Posts: 1417
Free Member
Topic starter
 

I'm looking to replace the rear hose on my Hope Tech M4 brakes, and want to double check that this is the right kit, can I use this one:

http://www.singletrackbikes.co.uk/m7b37s390p1305/GOODRIDGE_Hose_Kit_102_Hope_Mini_M4_M6/RS_GB/2405

Thanks


 
Posted : 25/02/2013 11:52 am
Posts: 0
Free Member
 

Yep looks fine.
You will probably be able to use some of your present connectors & have some spare ones left over. Make sure you get some instructions on how to re-make the connections.


 
Posted : 25/02/2013 6:38 pm
Posts: 1417
Free Member
Topic starter
 

Thank you! Im hoping to use the Goodridge connectors as I understand they're better than the hope ones? I've had problems getting this hose fitted after shortening, despite new olives and barb it still seems to get air in somehow.


 
Posted : 25/02/2013 6:54 pm
Posts: 0
Free Member
 

Alternatively - just buy 2m of the braided hose (sold separately at about £4 a meter) and two olives / two spikes (you'll probably get away with using the nitrile washers again)

You won't need the banjos cos they stay fitted to the caliper and lever.


 
Posted : 25/02/2013 7:00 pm
Posts: 0
Free Member
 

Edit - didn't see you'd already tried using the hope fittings


 
Posted : 25/02/2013 7:02 pm
Posts: 0
Free Member
 

If you have 'O' rings in the fittings ensure you have one on either side of the banjos - there may be a little recess for them to seat into. The copper washers can be re-used as they are but can also be re-anealed to soften them. Heat them up by a flame (gas ring) to they are blood red & then quench in water.

Compression fittings do also need to be reasonably tight - best done with little spanners so not to over tighten them.


 
Posted : 25/02/2013 7:36 pm

6 DAYS LEFT
We are currently at 95% of our target!